Overtown Transit Village Offices

Location: Miami, FL
Size: 50,000 SF
Services: General Contractor
Owner: Miami-Dade County – GSA
Architect: Gallardo Architects

The Overtown Transit Village (OTV) tenant improvement project consisted of a total of twenty-two floors slated for build-out. Thornton Construction performed the Tenant Improvement of floors 11-15, encompassing about 50,000 SF. The scope involved demolition and new finishes required for the new layout. The project also included power provisions for new systems furniture and modular walls, re-design of the fire alarm protection system, all life safety components to accommodate the new office layout and reconfiguration of HVAC supply and return grilles along with new VAV boxes and ductwork at certain areas.